View Single Post
  #20  
Old 03-26-2021, 02:32 PM
Kwaugh5p Kwaugh5p is offline
Recovered
 
Join Date: May 2018
Posts: 69
Default

Some more progress on the old girl. Transom has been recored with a 1 1/2 inch composite but before the composite was installed they layered the transom to 1/2 inch thick glass and finished it off with 4 more layers. The scupper drains are filled in as well as the old live well pick ups. The vent area was ground and glasses from the outside as well. Next steps are to build the stringers back to the transom and build the pocket for the through hull transducer than the floor.
Attached Images
      
Reply With Quote