View Single Post
  #31  
Old 05-21-2021, 03:37 PM
Locke N Load Locke N Load is offline
Recovered
 
Join Date: Oct 2017
Posts: 146
Default

It's been a minute since I updated this thread so I figured I should.

First we have the cuddy insert in. It has been completely recored with 1/2" Carbon-Core honeycomb. Thickened epoxy has been added all around the seam and next step is to add some glass. Those are Coosa supports around the step-in area.
Name:  Cuddy Insert.jpg
Views: 276
Size:  91.1 KB

Before that went in though I made a tray out of 3/4" Coosa for the batteries. Dual straps to keep the batteries in place. I may add more support when the time comes. 3" PVC pipe to run the battery cables to the helm area.
Name:  Battery Tray.jpg
Views: 268
Size:  93.2 KB

Now that I solved the issue of where the batteries can go I could work on the tank placement. It is as far forward as possible. This is the support structure in the tank tomb. My plan is to use 4200 at all the touch points to keep it secure.
Name:  Tank Bed.jpg
Views: 271
Size:  83.4 KB
Name:  Tank Bed 2.jpg
Views: 269
Size:  87.3 KB

I have also been working on removing all the pinstriping and stickers. Half way there. And getting the bottom paint off. Sanding is too slow. Mild chemicals are too slow. Time to step it up and use a mixture of lye I have read works. Unless anyone has any better suggestions. Then it is more structural work on the bulkhead separating the cuddy area from the deck, the helm and then rear seating/tankwell area and finally the deck.
Reply With Quote