View Single Post
  #38  
Old 08-30-2021, 10:51 AM
Locke N Load Locke N Load is offline
Recovered
 
Join Date: Oct 2017
Posts: 146
Default

Latest addition. A whole summer's worth of work to get the splashwell and seating done. Man, I work slow. Coosa core and anywhere from two to five layers of glass depending on area. The Carbon Core seat hatches open up and I am thinking the starboard side will have the fuel/water separator down between the stringers and the port will have the raw water washdown and baitwell pumps. The only permanent thing in the bilge will be a bilge pump and it will be easy to get to from a nice bag hatch.

Time to move onto the helm. And the 150 4S came in after 17 weeks.
Attached Images
 
Reply With Quote