Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > General Discussion > Repairs/Mods.

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 06-23-2008, 08:10 PM
RalphNitt RalphNitt is offline
Member
 
Join Date: Jun 2008
Location: Big Rock
Posts: 76
Default 23' SeaCraft pulpit construction

Our gameplan is to router 2 pieces of 1" StarBoard - gluing them together and adding a 1/2" PVC backer in the anchor locker. Everything thru bolts except the anchor light - and we are building it up on a 4" hollow pedestal so lightbeam can clear bit and anchor. We are using a Fortress FX-11
anchor with 12' of 3/8" SS chain and a 3000lb swivel attached to a thimble to 600' of 1/2" braided nylon line. It all ties up to a SS bit and dumps into the locker through a SS hawse.



__________________
"The sea is selective... slow at recognition of effort and aptitude, but fast at sinking the unfit" ...Felix Riesenberg
Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 01:01 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft