![]() |
#4
|
|||
|
|||
![]()
I'm going to enclose the transom on my 20 and install a bracket with platform (+ flotation). I'm also going to be installing Bennett hydraulic trim tabs. The plan is to move everything up as far to the front as possible...batteries, oil tanks, etc... I'll be posting update pictures as I am going. So far the list of things is:
Enclosed transom Hydraulic Steering Edson wheel Bennett Hydraulics Tabs New gas tank Cut the cap to make it 3 piece construction look All flush mount/pop up hardware Lee gunnel rod holders If I get to the transom part before you, I'll let you know how it goes. Unfortunately, I think it is going to take me at least 6 months to get everything done. [img]/images/graemlins/grin.gif[/img] Wishful thinking on my part. Luis |
Thread Tools | Search this Thread |
Display Modes | |
|
|