![]() |
#9
|
|||
|
|||
![]()
I finished the bulkheads and installed the new switch panel and fuse block on it. I decided to go at the transom from the back. That is now cut and all of the old, rotten plywood is removed. In addition, I started on the stepdown area since that was very bouncy. I made a slight mistake in cutting through the bottom fiberglass so the entire thing came out. How would you go about putting the floor back in? I was thinking of creating a few braces to install on the bottom and epoxy them at the proper height so the floor goes back in at the right level.
![]() ![]() ![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|