#1
|
|||
|
|||
Project update:
I have not posted about my 23cc restoration project for some time so I thought I'd let you fellas know were I'm at. The boat is 85% compete. Here is a list of whats left to do: 1. Finish the wiring. All I have left there is to neaten things up and install a few fuses that go from the pos bus terminal to the switch panel. I'll put in a stero and speakers after the boat is in the water. 2. Install some hinges on the big hatch that is forward of the CC. The first set I put on was an abortion so I have to fill the holes and install new hinges. 3. Paint the bottom and put on a boot stripe. 4. finish and paint the drop in insert for the CC and finish the CC door. I will make a removable fiberglass seat for the CC door. 5. Make a new anchor storage locker hatch 6. sand and paint the inside of the two forward hatches. The boat is going into the shop on Wednesday so they can give the engine the once over and make sure that everything is working properly. Today I installed the transducer. Strick
__________________
"I always wanted to piss in the Rhine" (General George Patton upon entering Germany) |
|
|