Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > General Discussion > Repairs/Mods.
FAQ Community Calendar Today's Posts Search

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #7  
Old 10-21-2004, 02:18 AM
Bigshrimpin Bigshrimpin is offline
Senior Member
 
Join Date: Dec 2002
Location: Onset, MA
Posts: 2,712
Default Re: stringer pieces in place.






Got the front section of the floor leveled. I used the sheet of 3/4" MDO crezon
cut into 3" strips. A 4x8 sheet is just enough material to cover the stringer tops with 2 strips (which raises the floor 1.5" + 1/4" of epoxy puddy/glass). I was very impressed . . . the MDO had a only few small voids in the entire sheet.

I still have to level the back 7ft of the boat, round the sharp edges, and add 2 layers of 1808 over the tops of the stringers.

The make shift floor is a bunch of mdf scraps.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 06:54 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft