#11
|
|||
|
|||
Re: Tore the skin right off my bottom!
Heyh Billybob-
According to the original lamination schedule on this site...your Seacraft is made up of the following layers: 3/4 oz mat 1.5oz mat 1.5oz mat 1.5oz mat 22oz roven 1.5oz mat 22 oz roven 1.5 oz mat 22oz roven With that in mind after the hull is grinded and prepped, I would lay up two layers of 1.5oz mat and then follow with alernating layers of 1808 biaxial & 1.5 oz mat until you reached the height of the original laminate. I think the maximum chemical bond window is about 72 hours with standard resin (layers 2 through whatever. Obviously, layer 1 will be a mechanical bond because the hull is 30 years old hence my reason for suggesting that you start out with two layers of 1.5oz mat which will offer good adhesion for the subsequent layers) |
|
|