23 straight inboard restoration
So far we added a new 350/350hp chevy, removed the tower, replaced every wire in the boat, replaced bilge pumps, re-did livewell, replace motor mounting blocks, replaced fuel tanks, replaced the front deck, replaced, or restored all wood, and a whole bunch of hardware and consmetic items. The boat's going to the fabricator to get a white powder coat hard T-top and 3 sided enclosure on Saturday. hopefully the pictures will attach. [image]2005_0327Ermiesboat0012[/image] [image]2005_0327Ermiesboat0014[/image] [image]2005_0327Ermiesboat0019[/image] [image]2005_0327Ermiesboat0026[/image] [image]2005_0327Ermiesboat0027[/image]
|