Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > General Discussion > Repairs/Mods.
FAQ Community Calendar Today's Posts Search

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 04-21-2007, 10:22 PM
strick strick is offline
Senior Member
 
Join Date: Aug 2003
Location: California
Posts: 2,738
Default Re: Here We Go Again

More bracket work. Better hurry Tim I'm catching up

The transom is made up of 2 pieces of 3/4 inch ply with a 5/8 inch foam in the center. This was cut to fit and cabosiled in place.



3 layers of 1708 over the top




The stringers are made of 2 pieces of 5/8 foam glued together. They are tabbed to the flotation chamber and glassed in place.




More foam is glassed in place to build a ledge for the swim platform to adhere to. cabosil will be used to bond the swim platform to the flotation chamber.




The foam ledge will be totally encapsulated in 1708. I need to let the glass set up tonight and tomorrow I will do a little trimming with my grinder and finish covering the ledge. Tomorrow AM this thing gets broke free from the mold so stay tuned!!

strick
__________________
"I always wanted to piss in the Rhine" (General George Patton upon entering Germany)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 06:04 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft