![]() |
#8
|
|||
|
|||
![]()
Once picked up a fully rigged Aquasport 250 Osprey from the rigid hardtop on top of the T-Top frame with only 3M double-sided foam tape providing the bond between the top and the rest of the boat. Twin 150 Fichts already hung and rigged. Incredible! That was in '98.
|
|
|