![]() |
#24
|
|||
|
|||
![]()
Alright, Alright.....
This is fishbox after two heavy coats of Signature. ![]() Yesterday the 3/8" fuel line that had been backordered was delivered after waiting for a month. Thanks to advice from Sea++ I swapped out my 1/4" pickup tube that came with the tank before the deck went in. ![]() After reviewing everything to make sure I hadn't forgotten anything to be installed below the deck I vacuumed her out one last time. You can see the bow area has one coat of Signature on it as well as the CC further in the background. ![]() The PVC pipe in the back right is for the raw water washdown. It almost got left out but remembered at the last minute. ![]() We balanced the deck on the bow to get in position to drop it in. ![]() After on last test fit I smeared Cabosil on the stringers and dropped it in place. After that cures I will go around the perimeter and add more cabosil where the deck rest on the blocking before I finish the seam with 2" tape. ![]()
__________________
Will |
|
|