![]() |
#1
|
|||
|
|||
![]()
I'm looking for a turn-key, Potter Built 20' CC. Found one with the following rebuilt items in 2002. Also has a 2010 E-tec 150 with very low hours. Can you coach me on questions to ask regarding quality of rebuild? Thanks in advance for any comments/suggestions
• Disassemble and clean hull to deck joint flanges. • Bond with WEST Pro-Set and 316L SS pop-rivets, fillet bond interior side. • New TACO rubrail and insert, 316L SS fasteners • Clean and fillet bond liner to hull joints with ProSet where accessible in rod lockers • All scuppers and through transom drains are sleeved with ProSet bedded G-10 tubes. Cockpit sole scuppers have adhesively bonded external venturi clamshell shrouds - they produce excellent vacuum when underway. • Vinylester laminate repairs were required along centerline/amidships. Access hole in cockpit sole, inside console, required for access. 2 Batteries sit on the cover plate. • Fair/align hull bottom, Duratec VE fairing, Interlux 2000 to 12 mil DFT • Replace transom with22 Kg/m 3 Divinycell PVC foam in vinylester putty/vinylester laminates, DuraTec blue VE fairing • Awlfair and Awlgrip hull • All hatch hinges replaced with GEM hinges • Hatch lift fittings replaced with GEM latching/locking fittings, cores closed-out with ProSet epoxy • All hatch flanges D section weatherstripped • All new smoothbore bilge pump discharge hoses • Ancor tinned wiring / shrink tube on all connectors • Re-positioned fuel fill from the top of the console ( where overflow flooded the instrument panel) to a recess-mounted filler on the port side of the console. • Leaning post with integral storage box, room for a 65 Qt. Igloo cooler. • Extra tall plex windshield. |
|
|