![]() |
#11
|
|||
|
|||
![]()
Pulled the cap last night. I'm planning to core the entire cap and widen the last 4-5 feet by splitting it down the center. Looking through lots of other builds it appears that getting the newly cored cap to follow the existing sheer line isn't a problem? The cap was much more flexible than I was expecting. Should I measure the sheer and block the cap to match before coring? Or will 1/2" of coring not make it rigid enough to worry?
|
|
|