![]() |
#3
|
|||
|
|||
![]()
Not sure if the deck was foam or wood in 88', but definitely need to cut enough to remove any rot. Yo can always run a ledger of core around the edge that matches the stringer height for the new deck to rest and be bonded to.
|
|
|