![]() |
#17
|
|||
|
|||
![]()
1. New plumbing for washdown
2. Plumb Livewell and wire two pumps fill and discharge. 3. Glass exposed wood in back hathches 4. Install switches for livewell pumps 5. Fix set screw in bowrail on starboard side 6. New LED Deck lights 7. Battery Charger 8. Order front Bow Cushions 9. Rewire Trailer and new lights 10. Seal and repaint livewell remove airator pump and install light. |
Thread Tools | Search this Thread |
Display Modes | |
|
|