Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > General Discussion > Off Topic / Fishing

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #10  
Old 04-11-2010, 08:41 AM
Blue_Heron Blue_Heron is offline
Senior Member
 
Join Date: Jan 2006
Location: Gator Country
Posts: 1,416
Default Re: First Things First

An extension cord from the house wasn't an option for me. It's over 300', and the voltage drop would be a problem.

With the exception of finishing the slab and installing the roll-up door, I did all the work myself with the help of a friend who's willing to work for steak dinners and cocktails. Scavenging the fixtures and equipment saved me a pile of $$. I'll have around $15K into it when it's done, but it's small, 720sf enclosed, 1200sf overall. The pole barn was purchased as a kit and is engineered for 110 mph wind load as is the roll-up door. If I were closer to the coast as Ken is, I think I would have gone with reinforced masonry construction too.

Dave
__________________
Blue Heron Boat Works
Reinventing the wheel, one spoke at a time.
Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 11:54 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft