![]() |
#11
|
|||
|
|||
![]()
I think I have had my floor panels done for a good year or two but hesitate to epoxy them down because I think I am forgetting something...however it is getting closer.
Painted both gas tanks with Tile Clad epoxy paint and put 1/4 inch Azek runners on the bottom. ![]() ![]() When checking the forward tank I found out that it rocked too much (v-type tank) and I had to pull it out and take it back to the welder and put some side tabs on it. New tabs. ![]() Three way valve for 2 tanks. ![]() Misc. fish box, cooler and shower hose connections. ![]() ![]() ![]() ![]() Then I did a little wiring using these neat little wire tie holders. ![]() ![]() Now I remembered that I am going to use pedestal type seats, so floor out again and beef up the area of attachment. ![]() Lay floors back down, see if fuel lines fit in openings. ![]() Now doing a final check I discover that the bulk head is in the way of thru bolting the engine box hinges. So a little grinding and sanding...this should work. ![]() Finally check out the Foam Flotation. ![]() Floors should be going attached in the next couple of weeks. So if you see something that stands out that I missed please let me know. Then it will be back to sanding and fairing again. ![]() ![]() ![]()
__________________
[SIGPIC][/SIGPIC] "If You Done It...It Ain't Braggin" my rebuild thread: http://www.classicseacraft.com/commu...ad.php?t=18594 |
Thread Tools | Search this Thread |
Display Modes | |
|
|