Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > General Discussion > Repairs/Mods.

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #12  
Old 01-02-2012, 01:07 AM
mbmcdermott18 mbmcdermott18 is offline
Junior Member
 
Join Date: Dec 2011
Posts: 27
Default

Got done trimming up the flange and put a radius on the corners. Also snapped a picture with the pumps just sitting in the box.

The wires will exit the rear and be sealed by blue sea cable grommets.

I am going to try the method Dave mentioned for fastening the pumps to the floor of the box.

After doing some reading on west system's website I was thinking of using thickened epoxy to seal everything up. Thought this might bond everything together well but would also be paintable so I could fillet the amount that squeezed out and make it look like there was no joint.
Attached Images
  
Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 11:38 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft