Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > Recovered Threads

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #6  
Old 09-18-2013, 02:36 PM
seabass08 seabass08 is offline
Member
 
Join Date: Nov 2012
Location: Cape Ann, MA
Posts: 31
Default

The floor has already been done and raised 2.5"+. The fuel tanks are fairly new and and in good condition as well. I do need to reposition them tho. The stringers will get done at some point, just not sure i will have the time to get them done this winter.
Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 05:05 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft