Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > General Discussion > Repairs/Mods.

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #10  
Old 06-21-2015, 09:55 PM
billythekid billythekid is offline
Senior Member
 
Join Date: Feb 2007
Location: NJ shore
Posts: 485
Default

alright the finishing touches are being done and the boat will be headed north in the next week. Everything is finished with the wiring, I had Randy add 4 under gunnel lights for night fishing. The only thing we are having a little trouble with is the Suzuki rigging, but hopefully that will be ironed out tomorrow.


After Randy did the final rigging, the boat was brought done the street to Fiberglass Florida in Stuart to have the SEADEK coaming pads and front cushion installed. So far they have knocked it out of the park. I went with this type of coaming pad because its only about 3/4" thick and the wear is far superior to a regular cushion type. I also had them put the lines in the seat cushion. they will be finishing the last two pieces on Monday.
Attached Images
      
__________________
36' Yellowfin
1972 20' seacraft 140 suzuki

http://www.classicseacraft.com/commu...ad.php?t=18607
Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 07:17 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft