Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > Recovered Threads

Notices

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 08-03-2016, 07:21 PM
linesider36 linesider36 is offline
Recovered
 
Join Date: Jun 2015
Posts: 100
Default day 10 at the Shipyard

We're moving right along. Transom plywood was put together with 2 layers of 1708 in between the plywood. Then 4 layers on the outboard side and 1 layer on the inboard side. Everything was ground down and shaped and made ready to go into the boat. Today they put the new transom into the boat pressing it into a bed of thickened epoxy. Everything was screwed and clamped and left to set up, which it is doing now. It will be bulletproof when it's done. Can't wait!
Attached Images
       
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 08:23 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft