Progress... Coming Along
Yesterday in the nice chilly 23 degree day i was able to remove all the hardware, side vents and old Aluminum Rub rail. The rub rail was a PIA as it had many broken screws and i am getting good at Breaking Shit easily when i get P.O'ed.
Also installed a new Neutral Switch and Neutral position sensor on the 300 zuke taking longer to remove the side cowling than to put the switches in. I am taking it over to be Re-flashed today to see if it cures the 4-2 Engine code. Once this is fixed I am selling the 300 Zuke and i am strongly considering a 400R Verado.
This morning its beautiful out and the temp is hovering at 9 degrees doubt i am getting much done today.
|