![]() |
|
#1
|
|||
|
|||
![]()
Got the livewell plumbed earlier in the week and last night my son and I installed the bracket
![]() Going to keep moving forward on my punch-out list. Really hope to have it 100% done by the 16th... |
#2
|
|||
|
|||
![]()
Installed new latches on the transom pieces plus two new rod holders, hung the electronics/storage box, as well as reinstalled the grab rail on Saturday.
Today, the afternoon rains are putting a damper on things for me. So far I got all of the old rigging removed. Removed old gauges. Started pulling out any old/unnecessary wiring. Might run to West Marine and get a rigging flange while I wait for the sun to come back out. Also need to add to my punch-out list - New guide posts and lights for the trailer. I may also install new wheel bearings and hubs if I have the time. No pictures since it is pouring down rain right now ![]() |
#3
|
|||
|
|||
![]()
Finished removing all old rigging, made and installed new doors for the center console, installed a new livewell pump, and repainted the deck since it got all screwed up from my carelessness while redoing the transom.
Almost ready to bring to International Marine on Tuesday! |
#4
|
|||
|
|||
![]()
Guide posts installed on trailer, new trailer lights on guide posts, Rigging tube flange installed, ping pong ball scuppers installed on outer drains and rear bolsters installed.
Couple of minor things to do after work tomorrow before hooking her up to the truck to bring down to IM first thing Tuesday morning ![]() Looks like I will also need new axles and leaf springs for the trailer pretty soon. Getting kind of rusty under there... |
#5
|
|||
|
|||
![]()
Dropped her off at IM at 8:30 this morning
![]() ![]() ![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|