Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > Recovered Threads

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #39  
Old 03-12-2021, 09:52 PM
take a potter take a potter is offline
Member
 
Join Date: Apr 2012
Location: lexington, virginia
Posts: 85
Default

Some more progress. Temps were in the 70's this week so got some glassing done outside.

After carefully inspecting the center stringer as well as the tabbing that was visible on the box stringers, I can not find any problems. Therefore against advise, I decided not to replace the center stringer. I ground the glass down on the stringer and about 7" each side. Laid in a nice cabosil filet and skim coated everything with putty to fill any irregularities, then I laid 3x 1700 stepping back an inch each time. I also laid up 2x 1708 to add tabbing to the box stringers.

Name:  20210310_100014.jpg
Views: 92
Size:  58.4 KB

I got the fuel tank shelf laid up with 2x 1700 each side. Then made supports out of PVC and 5200'ed them down. Placed the shelf and bonded it to the supports with 5200 and 2x tabbed it on both sides.

Name:  20210304_141459.jpg
Views: 91
Size:  30.9 KB

Name:  20210311_095423.jpg
Views: 92
Size:  57.0 KB

Name:  20210312_114431.jpg
Views: 92
Size:  33.7 KB

Also got the bottom of the scuppers glassed over after removing the brow, with its associated air gaps between lamination.
Attached Images
 
Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 05:30 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft