![]() |
#16
|
|||
|
|||
![]()
We are creeping up on finishing the transom. Here is the inner wall being trial fit.
![]() A view of the back side of the inner transom wall. The flanges have been installed on the lower hatches. PVC rod holder tubes are also epoxied in place. ![]() The wall assembly glassed in place. ![]() |
|
|