![]() |
#11
|
|||
|
|||
![]()
Most of the fairing (except for the floor) is now being finished up.
![]() ![]() ![]() High build primer. ![]() ![]() ![]() Underside of the bow. Holes have been pre-drilled for the anchor roller and the rub rail. ![]() |
|
|