![]() |
|
#1
|
|||
|
|||
![]() A couple people started this as a “classic seacraft” project so it saved me some money and sawzall blades |
#2
|
|||
|
|||
![]() The hull is braced to prevent twisting and the stringers were removed |
#3
|
|||
|
|||
![]() The hull was ground and sanded with 60 grit, stringers were built from h60 2” foam with 2 layers of 1708, stringers were triple tabbed to the hull (one of which was a full wrap), coosa 20 was glasses in for fuel tank and bilge bucket shelf, sealed compartments were foamed. |
#4
|
|||
|
|||
![]() I needed to feel some progress to I cut the low density 1/2” coosa that would become the sole. |
#5
|
|||
|
|||
![]() The bilge and the forward fish box were sprayed with raptor liner. Reduces fairing and is almost bulletproof |
#6
|
|||
|
|||
![]() Battening to draw out the new shearline and give her some curves |
#7
|
|||
|
|||
![]() Shearline after the shaping but before the blocking |
![]() |
|
|