View Single Post
  #6  
Old 09-18-2013, 02:36 PM
seabass08 seabass08 is offline
Member
 
Join Date: Nov 2012
Location: Cape Ann, MA
Posts: 31
Default

The floor has already been done and raised 2.5"+. The fuel tanks are fairly new and and in good condition as well. I do need to reposition them tho. The stringers will get done at some point, just not sure i will have the time to get them done this winter.
Reply With Quote