![]() |
|
#1
|
|||
|
|||
![]()
The floor has already been done and raised 2.5"+. The fuel tanks are fairly new and and in good condition as well. I do need to reposition them tho. The stringers will get done at some point, just not sure i will have the time to get them done this winter.
|
![]() |
|
|