Spent a day getting the second layer on the transom and some tabbing done. Cut a section of 1708 large enough to rap a few inches on each side and down the bottom for one nice continuous run threw the tabbed section. Once that was down I added several more tabs to the sides and bottom building on top of each other. Its starting to get a little cold over night here and since I am using a slower cure epoxy that was purchase back when it was hot out I tried to keep the temp up. I threw a insulated blanket over the back of the boat and placed a heater at the base threw the night to keep the temp above 70 degrees for the cure.
Hours: 6
Total Hours: 64
__________________
Current SeaCraft projects:
68 27' SeaCraft Race boat
71 20' SeaCraft CC sf
73 23' SeaCraft CC sf
74 20' SeaCraft Sceptre
74 20' SeaCraft CC sf
|