![]() |
#24
|
|||
|
|||
![]()
All the floor supports are glassed. Rigging tube has had final cuts. The knees for the transom have been cabosiled in. I just need to grind it down and wrap it all in glass. The fuel tank is in. It is a 50gal plastic Inca. The pickup and sending unit will be under the console. I will just need one plate to access the fill and vent up front. The box behind the tank will be for my life jackets. I will have a hatch under the console as well. Now all I need to do is grind where everything is going and glass it all in. Also finished putting some fairing compound on the bottom of the hull and transom.
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|