phase 1 update
Got a little work done. The wheel house is primed but needs a little more fairing. Also made some progress with my scuppers. Being a commercial rod and realer I felt the current set up was not practical so i went with two extra scuppers on top of the factory thru deck. My first scupper is thru the deck to a catch basin in the hull. In the catch basin there will be a 1500 bilge. This scupper has a strainer and will used to discharge spray water rain water and hose wash down. My second scupper is 3" thru the transom. It is threaded so a stopper can be put in or taken out when needed. During the day big chunks of bait and other fish parts wind up on the deck. Now all i have to due is pull the plug and under a slow speed 5 galllon bucket the deck Got my windows today so i now need to make some frames.
|