Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > General Discussion > Repairs/Mods.
FAQ Community Calendar Today's Posts Search

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #5  
Old 04-18-2012, 07:23 PM
NILS NILS is offline
Member
 
Join Date: Aug 2011
Posts: 31
Default phase 1 update

Got a little work done. The wheel house is primed but needs a little more fairing. Also made some progress with my scuppers. Being a commercial rod and realer I felt the current set up was not practical so i went with two extra scuppers on top of the factory thru deck. My first scupper is thru the deck to a catch basin in the hull. In the catch basin there will be a 1500 bilge. This scupper has a strainer and will used to discharge spray water rain water and hose wash down. My second scupper is 3" thru the transom. It is threaded so a stopper can be put in or taken out when needed. During the day big chunks of bait and other fish parts wind up on the deck. Now all i have to due is pull the plug and under a slow speed 5 galllon bucket the deck Got my windows today so i now need to make some frames.
Attached Images
       
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 07:07 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft