![]() |
#6
|
|||
|
|||
![]()
The problem I see, which I think Tashmoo pointed out, is that that the working time of these epoxies is only 42 minutes (in the case of the six10).
Sounds like system 3 has a slow kick catalyst too. Mixing your own, has a lot of variables if not very familiar with your product...refrigerating as shine mentioned is probably best. In all cases you better get a buddy or 2 with 4 caulk guns to lay the beads and have the floor ready to place with the weights right by and set to place.
__________________
there's no such thing as normal anymore... |
|
|