Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > General Discussion > Repairs/Mods.
FAQ Community Calendar Today's Posts Search

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 02-03-2013, 10:03 AM
strick strick is offline
Senior Member
 
Join Date: Aug 2003
Location: California
Posts: 2,738
Default

Work is never really done on a boat but the little 20 sceptre is about as complete as you can get. All there is left to do now is to calk around the engine and live well hatches. Finish installing the GPS and fishfinder touch up paint some little dings and screw ups, get the engine height and prop right after the christening and test drive which will take place later this morning. Bill came over yesterday and we got the bracket mounted on the Yellow Tsunami. Now that the 20 sceptre is complete I can focus some attention back to that boat which I have been neglecting over the past several months. Since I have a lot of pictures I will just get to posting them.




















Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:12 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft