Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > General Discussion > Repairs/Mods.
FAQ Community Calendar Today's Posts Search

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #7  
Old 03-15-2013, 07:54 PM
armandozx armandozx is offline
Junior Member
 
Join Date: May 2007
Location: Miami,FL
Posts: 12
Default

Thank you all.
Plan is as follows. Everything will be cut and dug from bow to stern. Stringers will be foamed and glassed, they will also be extended and joined to the transom, similar to Shine's work (awesome work by the way). When that is done I plan to move to the fuel tank which will be sitting on a fiberglassed piece of plywood maybe ½ or 3/8 not sure what the glass guy said at the moment. I would also like to put a couple of stardboard pieces there to avoid any corrosion in the future. Tank will be sanded and gelcoated 2 layers.
How does that sound up to now guys?

After that is done I will run my hoses for all my electrical stuff to run through and sealed the sides to further prevent exposing water to the new foam and foam at the level of the stringers or basically below the floor level.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 12:04 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft