![]() |
|
#1
|
|||
|
|||
![]()
nice job, how do you plan on treating under the transom cap to cockpit transition? solid with scupper tubes through? looks like some storage space is available
|
#2
|
|||
|
|||
![]()
The floors have channels on the sides of the crowned deck that lead through transom into scuppers no tubes just thickness of transom which is 2 1" blue water 26 panels in multi layers and tabbing. the floors were raised crowned and all one level from where the old floor was as far as transom transition to cockpit not really sure if it will just have a single rig tube and then finish it like it is or cover it up. But everything is planned to run through bracket like hermco rig theirs instead of through transom. Under the floors is a Shiite load of storage as the stringers where redesigned with 2" nidacore
|
#3
|
|||
|
|||
![]()
Got rod holders on ttop tabbed in place and two more biax "last" on transom
And more leveling |
![]() |
|
|