Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > Recovered Threads
FAQ Community Calendar Today's Posts Search

Notices

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 01-18-2016, 06:16 PM
mikey813 mikey813 is offline
Recovered
 
Join Date: Jan 2016
Posts: 5
Default

nice job, how do you plan on treating under the transom cap to cockpit transition? solid with scupper tubes through? looks like some storage space is available
Reply With Quote
  #2  
Old 01-18-2016, 09:30 PM
Franksanzo Franksanzo is offline
Member
 
Join Date: Jul 2012
Location: Boca raton
Posts: 84
Default Scuppers

The floors have channels on the sides of the crowned deck that lead through transom into scuppers no tubes just thickness of transom which is 2 1" blue water 26 panels in multi layers and tabbing. the floors were raised crowned and all one level from where the old floor was as far as transom transition to cockpit not really sure if it will just have a single rig tube and then finish it like it is or cover it up. But everything is planned to run through bracket like hermco rig theirs instead of through transom. Under the floors is a Shiite load of storage as the stringers where redesigned with 2" nidacore
Attached Images
 
Reply With Quote
  #3  
Old 02-14-2016, 08:48 PM
Franksanzo Franksanzo is offline
Member
 
Join Date: Jul 2012
Location: Boca raton
Posts: 84
Default Weekend progress

Got rod holders on ttop tabbed in place and two more biax "last" on transom
And more leveling
Attached Images
 
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 03:46 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft