![]() |
#8
|
|||
|
|||
![]()
Jon G,
That was the method that I used. Six sheets of epoxy soaked 1/4" luan with biaxial cloth in between each sheet. Works great. Lay up time depends on what you use for saturating the cloth. I can tell you that you need more than two hands, and you have to work fast. Rich
__________________
Cape Marine Supply |
|
|